Steyr / AT

ILL - Industrie Logistik Linz

In recent years, the Steyr location of Industrie Logistik Linz was expanded over several construction phases. Many different versions of the Peneder arched roof were used. During the first construction phase, a second row of roof shells including insulation materials was added to an existing single-shell arched roof. A façade was also attached to create a heat-insulated warehouse. During the second construction phase, the Peneder arched roof was used as a fly roof and later partially supplemented with a building envelope. During the third expansion, steel structures and a double-shell arched roof including building envelope were installed.

Aesthetic industrial roofing

Impressions